foundation backfilling

Last Updated 3 weeks ago by Kenya Engineer

When planning a construction project, whether it be for a small residential structure or a more significant development, it’s easy to account for direct costs like cement, masonry work, and sand. However, there are numerous indirect costs that often catch first-time builders off guard. One of these crucial yet sometimes underestimated aspects is foundation backfilling.

What is Foundation Backfilling?

Foundation backfilling refers to the process of filling the space within and around the footings and substructure of a building after the foundational work is complete. This step is vital for structural stability, ensuring that the base of the building is well-supported and capable of withstanding pressure from both the structure and the surrounding soil.

Why is Backfilling Necessary?

After completing the footings or substructure of a building, the area needs to be filled with material, typically sand or laterite, to support the foundation and create a level base for further construction. The backfilling process helps distribute the load, prevent water accumulation, and mitigate potential settlement issues over time.

Costs Involved in Backfilling

The expenses associated with backfilling can be significant, and it’s essential to budget accordingly. The cost varies based on factors such as the project’s location, the type of soil needed, and the size and depth of the substructure.

  • Material Cost: A single trip of laterite, a commonly used filling material, can cost anywhere from Ksh 3,500 to 4,500. Depending on the volume of your substructure, you may require 7-10 trips, if not more. This initial outlay alone can be considerable.
  • Labor Costs: Once the sand or laterite is delivered to the site, it needs to be moved into the substructure. This task often requires hiring a team of workers. For example, employing five workers at a rate of ksh 600 per person per day results in a minimum of ksh 3000 daily. The total cost will multiply with the number of days needed for completion.
  • Machine Hire: To streamline the backfilling process, many builders opt to use heavy machinery such as excavators or bulldozers. These machines can fill the foundation faster than manual labor alone, but they require additional hands for final leveling. Some contractors might choose to have the machinery climb onto the foundation to spread and compact the sand, though this method can be risky as it may damage the structure.

The Settling Phase

Builders should be aware that the initial backfilling is not the end of the process. The fill material will settle over time, causing the level of the substructure to sink slightly. This natural settling means that additional filling may be necessary in the weeks or months following the initial process. For this reason, keeping an extra trip of sand or laterite on-site for future top-ups can save time and ensure the foundation remains level and secure.

Maximizing Cost Efficiency

Builders looking to save on backfilling costs should consider the potential value of the land itself. For instance, a plot with an existing clay hill or mound can be a hidden asset if the clay is ideal for backfilling. Rather than dismissing such a plot in favor of a flat one, proactive planning can turn that extra soil into a cost-effective filling solution.

Important Considerations

  1. Choosing Between Manual and Mechanical Filling: While using an excavator or bulldozer is efficient, it still requires human labor for the final touch of leveling. However, not all builders are comfortable with machinery climbing onto their new foundation, as it can potentially compromise the structure’s integrity.
  2. Quality Control: Compaction is a critical part of backfilling to ensure the material is densely packed and less prone to shifting. While machines can aid this process, manual compaction is sometimes used for precise areas.
  3. Long-Term Planning: Builders should plan for potential future settlements of the filling material. Having a reserve of fill on hand prevents delays when a top-up is required.

Conclusion

Foundation backfilling is more than just an optional step in construction; it is an integral part of establishing a strong, long-lasting base for any structure. Understanding the associated costs, potential challenges, and strategic approaches to using existing land features can help builders prepare better, manage their budgets, and achieve efficient and effective results. By considering these elements early in the planning phase, construction projects can proceed with fewer unexpected financial strains and a more secure foundation.