Last Updated 11 years ago by Kenya Engineer

Eldoret water supply project: Ellegirini pipeline and expansion of Kapsoya treatment works

Type : Tender ( IFB ) 

 

Category : Engineering & Construction , Roads & Sewarage Construction

Ref No : LVNWSB/WASSIP-AF/WRK/KAP-ELEG/02/15

By : LAKE VICTORIA NORTH WATER SERVICES BOARD

Closing : Tue, Nov 03, 2015 12:00

Eligibility :  Kenya

 

LAKE VICTORIA NORTH WATER SERVICES BOARD

P. O Box 673 – 50100, KAKAMEGA, TEL: 0562031552,

Fax 0562031506, Email: info@lvnvreb.go.ke

Invitation for Bids (IFB)

 

 

Country: KENYA 

Project: WATER AND SANITATION SERVICES IMPROVEMENT PROJECT ADDITIONAL FINANCING (WASSIP-AF)

Credit N°: 51030KE

Contract Title: ELDORET WATER SUPPLY PROJECT: ELLEGIRINI PIPELINE AND EXPANSION OF KAPSOYA TREATMENT WORKS

     Contract No.: LVNWSB/WASSIP-AF/WRK/KAP-ELEG/02/15

     IFB No: LVNWSB/WASSIP-AF/WRK/KAP-ELEG/02/15

1. The Government of Kenya has received financing from the World Bank (IDA) towards the cost of Water and Sanitation Services Improvement Project – Additional Financing (WASSIP-AF) and intends to apply part of the proceeds towards payment under the contract for Eldoret Water Supply Project Ellegirini Pipeline and Expansion of Kapsoya Treatment Works

2. Lake victoria North Water Services Board now invites sealed Bids from eligible Bidders for the Eldoret Water Supply Project Ellegirini Pipeline and Expansion of Kapsoya Treatment Works. The Works consist of:

a) Raw Water Pipeline from Ellegirini Dam to Naiberi and Kapsoya Water Treatment Works and comprising of:

 

i)          5.2km length of 400mm dia. Ferrous Pipes

ii)         11.2km length of 350mm dia. Ferrous Pipes

iii)        0.2km length of 150mm dia. Ferrous Pipes

 

iv) Associated Pipeline Appurtenances including Air Valves, Washouts and Chambers

b) Rehabilitation of Existing Kapsoya Water Treatment Works to restore its original Design Capacity of 3,500myd.

c) Expansion of Kapsoya Water Treatment Works by an additional capacity of 3,500mVd. Expansion Works comprise of construction of:

 

i)          Chemical Storage, Mixing and Dosing Building

ii)         Inlet Works comprising of Stilting Basin and inlet Channel

iii)        Sedimentation Tanks, vertical Hopper Bottom Type (3 Nr)

iv)         Rapid Gravity Sand Filters (3 Nr)

v)          Chlorine Mixing and Dosing Building

vi)         Elevated Backwash Water Tank of capacity 100m5

vii)    Backwash Water and Sludge Lagoon

viii)   Sludge Drying Beds (2 No)

ix)    Associated Electrical and Mechanical Works 

x)    Site and Ancillary Works comprising of Fencing, Drainage, Access Roads and Works Pipelines.

d) Construction of Naiberi Water Treatment Works of capacity 2,000m3/d and comprising of:

i) Chemical Storage, Mixing and Dosing Building

ii) inlet Works comprising of Stilling Well and Chemical Dosing Channel

iii) Flocculation Basin – Gravity Type (1 Nr)

iv) Sedimentation Tanks – Horizontal Flow Type (2 Nr)

v) Rapid Gravity Sand Filters (2 Nr)

vi) Chlorine Storage, Mixing and Dosing Building

vii) Treated Water Tank of capacity 500m

viii) Backwash Pump House

ix) Elevated Backwash Water Tank of capacity 100m.

x) Miscellaneous   Building  Works   including   Operator’s Office, laboratory and Store, Staff Houses (4 Nr) and Guard House.

xi) Associated Electrical and Mechanical Works

xii) Site and Antiftary Works comprising of Fencing, Drainage, Access roads and Works Pipelines.

a) Water Distribution Network to Kipkorgot, Islamic Centre, Duka Moja and Naiberi comprising of:

i)          8i!km length of 200mm dia. Ferrous Pipes

ii)         0.9km length of 160mm dia. uPVC Pipes

iii)        3.7km length of 110mm dia. uPVC Pipes

iv)         6.3km length of 90mm dia. uPVC Pipes

v)         Associated Pipeline Appurtenances including Valves, Meters, Air valves, Washouts and Chambers

 

The Construction period is 20 Months.

 

1.  Bidding wit) be conducted through the International Competitive Bidding (ICB) procedures as specified in the World Bank’s Guidelines: Procurement of Goods under IBRD Loans and IDA Credits & Grants by World Bank Borrowers for Procurement of Goods, Works and Non-Consulting Services issued in January 2011 and revised in Jury 2014 (“Procurement Guidelines”), and is open to ail eligible Bidders as defined in the Procurement Guidelines. In addition, please refer to paragraphs 1.6 and 1.7 setting forth the World Bank’s policy on conflict of interest

2  Interested eligible Bidders may obtain further information from the address specified below and inspect the Bidding Documents during office hours from 0800 hours to 1700 hours local time from Monday to Friday, except during lunch hour (1300 hours to 1400 hours), weekends and public holidays.

3. A complete set of Bidding Documents in English may be purchased by interested eligible Bidders upon the submission of a written application to the address below and upon payment of a nonrefundable fee of KSh. 1,000 (Kenya Shillings One Thousand only) or equivalent in a freely convertible currency. The method of payment will be Cash or Banker’s Cheque. The Bidding Document will be collected from the below address upon production of a purchase receipt

4.  A Pre-bid meeting shall take place at Eldoret – ELDOWAS Offices on 14* October 2015 from 09.00AM East Africa Time and Bidders are invited to attend at their own cost

5.  Bids must be delivered to the address below on or before 12.00 Noon East African Time on 3rd November 2015 The packages should be dearly marked; Eldoret Water Supply Project Ellegirini Pipeline and Expansion of Kapsoya Treatment Works, Contract No.: LVNWSB/WASSIP-AF/WRK/KAP-ELEG/ 02/15. Electronic Bidding will not be permitted. Late Bids will be rejected. Bids will be publicly opened in the presence of the Bidders’ designated representatives and anyone who choose to attend at the address below on 3rd November 2015 at 12.05PM East African Time

6. All Bids must be accompanied by a Bid Security in the form of an unconditional Bank Guarantee of KSh. 10,000,000 (Kenya Shillings Ten Million) or equivalent amount in a freely convertible currency.

7. The address referred to above is:

Chief Executive Officer

Lake Victoria North Water Services Board

Kefinco House, Off Kakamega/Kisumu Road

 

Tel: +254 56 2030795/ 2031552

Fax: +254 56 2031506













LEAVE A REPLY

Please enter your comment!
Please enter your name here